Permanent
1. ENGLAND - East Coast - Bar Flat N - Radio reporting point. - In the Wash, off the approaches to Boston;
2. ENGLAND - East Coast - Lowestoft SE - Wreck. Buoyage. Radar beacon. - removal of the 4 Trinity House wreck buoys marking the Ella'. The wreck has also been removed.
Usual images on http://www.crossingthethamesestuary.com/page9.html
Temporary
1. Harwich Harbour, berths and approaches - dredging until approximately the 18th December;
2. Port of Wells - dredging;
3. London Array - notice of works on turbine E17 requiring a 500m exclusion zone - this does not affect Foulger's Gat. D20 (again away from the Gat) continues to have its 'permanent' 500m exclusion by dint of its damage blade.
1. ENGLAND - East Coast - Bar Flat N - Radio reporting point. - In the Wash, off the approaches to Boston;
2. ENGLAND - East Coast - Lowestoft SE - Wreck. Buoyage. Radar beacon. - removal of the 4 Trinity House wreck buoys marking the Ella'. The wreck has also been removed.
Usual images on http://www.crossingthethamesestuary.com/page9.html
Temporary
1. Harwich Harbour, berths and approaches - dredging until approximately the 18th December;
2. Port of Wells - dredging;
3. London Array - notice of works on turbine E17 requiring a 500m exclusion zone - this does not affect Foulger's Gat. D20 (again away from the Gat) continues to have its 'permanent' 500m exclusion by dint of its damage blade.
Local NtMs compiled by and reproduced by kind permission of Roger Gaspar, author of Crossing the Thames Estuary
No comments:
Post a Comment